Brand | FEIYOU |
Certificate | ISO14001、ISO18000、ISO9001、TUV |
Item number | FY325-02 |
Modules | Climbing Frames, Stands, Posts, Climbing Blocks, Screw |
Product Size | Φ509*220cm |
Materials | a. Plastic parts: UV Resistant LLDPE b. Post: Galvanized steel pipe c. Metal: Galvanized steel d. Fasteners: 304 stainless steel (Different materials are available at your demand) |
Advantage | a. Anti-UV b. Anti-static c. Security d. Environmental protection e.Color is not easy to fade |
Installation | 12hours (2 persons) |
Falling Height(cm) | 2200 |
Capacit | 5-8 |
Apply to | Amusement parks, kindergartens, nursery centers, parks, residential areas |
Delivery time | 10 days after received first payment |
Warranty | 3 years for plastic & metal parts |
Remark | 1.Please check the screws and other catchers regularly to ensure that the structure is firm. 2. Please ensure that all children play under adult supervision. 3. Blunt objects and acidic corrosive liquids are forbidden. |
▍Hot-sale product
▍Why choose us?
1.The products have passed ISO, TUV and other certifications, and the raw materials have passed the SGS test, which is safe and environmentally friendly.
2.We are manufacturer with more than 30 years of history. We has an overall quality R&D, design, production, sales and service management team.
▍Product case
▍Our services
1. Before shipping, we will strictly check each component to ensure there is no problem.
2. We have an excellent after-sales service and we are keen to establish a long-term and stable cooperative relationship with our customers.
▍Product advantages
1. Column: Smooth surface, strong UV resistance, bright colors, not easy to fall off, corrosion resistant.
2. Platform: Platform carrying capacity (in line with the EU EN1176 standard)
▍Material details
1. Nut and Bolts: Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.
All open ends of pipe been closed by GI / PVC caps for user safety against entrapment.
2. All metal pipes are Hot Dipped Galvanized Pipes conforming to GB/T 13793-2008 with thickness of 2.5mm.
▍production base
▍Production line & Equipment Rotating for Plastic Parts ▍Production line & Equipment meral parts
▍Packing
▍FAQ
Q1:what is the payment term and delivery time?
T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.
For order more than 50,000.00$, we accept L/C.
For trial orders, we accept western union, paypal or cash.
Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.
Q2: How can I place order?
Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.
Q3: What about the Installation?
We can provide our professional installation team for assembling the playground in your area, you will be in charge for all the costs for the team.
▍Customer group photo
▍Qualification certificate
▍Customer feedback