Brand | FEIYOU |
Certificate | ISO14001、ISO18000、ISO9001、TUV |
Item number | FY252-01 |
Modules | Screws, net buckles, climbing ropes, pedals, climbing ladders, pillars |
Product Size | 600*600*210cm |
Materials | a. Plastic parts: UV Resistant LLDPE b. Post: Galvanized steel pipe c. Metal: Galvanized steel d. Ropes: Six strand wire rope e. Fasteners: 304 stainless steel (Different materials are available at your demand) |
Advantage | a. Anti-UV b. Anti-static c. Security d. Environmental protection e.Color is not easy to fade |
Installation | 12hours (3 persons) |
Falling Height(cm) | 2100 |
Capacit | 15-30 |
Apply to | Amusement parks, kindergartens, nursery centers, parks, residential areas |
Delivery time | 10 days after received first payment |
Warranty | 3 years for plastic & metal parts |
Remark | 1.Please check the screws and other catchers regularly to ensure that the structure is firm. 2. Please ensure that all children play under adult supervision. 3. Blunt objects and acidic corrosive liquids are forbidden. |
▍Hot-sale product
▍Why choose us?
1.The products have passed ISO, TUV and other certifications, and the raw materials have passed the SGS test, which is safe and environmentally friendly.
2.We have five production areas with nearly 130,000 square meters of modern standard workshop. Product is cost-effective with reliable quality.
▍Product case
▍Our services
1. Before shipping, we will strictly check each component to ensure there is no problem.
3. We have an excellent after-sales service and we are keen to establish a long-term and stable cooperative relationship with our customers.
▍Product advantages
1. Long warranty period, 2 years for metal parts and 3 years for plastic parts.
2. Column: Smooth surface, strong UV resistance, bright colors, not easy to fall off, corrosion resistant.
▍Material details
1. The plastic material is made of imported engineering plastics from Matrix, which is resistant to ageing and maintain colour and gloss.
2. The surface of the steel pipe parts is treated with corrosion-resistant galvanization.
▍production base
▍Production line & Equipment Rotating for Plastic Parts ▍Production line & Equipment meral parts
▍Exhibition case team
▍FAQ
Q1:what is the payment term and delivery time?
T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.
For order more than 50,000.00$, we accept L/C.
For trial orders, we accept western union, paypal or cash.
Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.
Q2: How can I place order?
Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.
Q3: What about the Installation?
We can provide our professional installation team for assembling the playground in your area, you will be in charge for all the costs for the team.
▍Customer group photo
▍Qualification certificate
▍Customer feedback