Brand | FEIYOU |
Certificate | ISO14001、ISO18000、ISO9001、TUV |
Item number | FY-13401 |
Product Size | φ40*95cm φ35*95cm |
Materials | a. Galvanized sheet iron (Different materials are available at your demand) |
Advantage | a. Anti-UV b. Anti-static c. Security d. Environmental protection e.Color is not easy to fade |
Installation | 1hours (2 persons) |
Apply to | Amusement parks, parks, residential areas |
Delivery time | 10 days after received first payment |
Warranty | 3 years for plastic & metal parts |
Remark | 1.Please check the screws and other catchers regularly to ensure that the structure is firm. 2. Please ensure that all children play under adult supervision. 3. Blunt objects and acidic corrosive liquids are forbidden. |
▍Hot-sale product
▍Why choose us?
1.Our products sell well in more than 60 countries and regions, and have provided services such as planning and design, preschool education equipment and educational toys for more than 50,000 kindergartens and communities around the world.
2.We have five production areas with nearly 130,000 square meters of modern standard workshop. Product is cost-effective with reliable quality.
▍Product case
▍Our services
1. We have an excellent after-sales service and we are keen to establish a long-term and stable cooperative relationship with our customers.
2. Free detailed installation diagrams to ensure you can solve installation problems after receiving the product.
▍Product advantages
1. Platform: Platform carrying capacity (in line with the EU EN1176 standard)
2. Iron parts: (Pipe quality are in line with the requirements of BS1387-1985 standard, technical standards meet BS1387-1985 ) welding using argon arc welding and CO2 gas shielded welding (in line with GB/T8810-1995 requirements )
▍Material details
1. The platform and stairs are made of corrosion resistant steel plates from Baogang Group.
2. The plastic material is made of imported engineering plastics from Matrix, which is resistant to ageing and maintain colour and gloss.
▍production base
▍Production line & Equipment Rotating for Plastic Parts ▍Production line & Equipment meral parts
▍Advanced equipment
▍FAQ
Q1: How long does it take to get a plan or design?
It depends on the size of your playground. It takes 1-2 days to complete an overall design.
Q2:what is the payment term and delivery time?
T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.
For order more than 50,000.00$, we accept L/C.
For trial orders, we accept western union, paypal or cash.
Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.
▍Customer group photo
▍Qualification certificate
▍Customer feedback