FY211-02
FY211-02
FY211-02
park children plastic playground Manufacturer
Product Description

Brand

FEIYOU

Certificate

ISO14001、ISO18000、ISO9001、TUV

Item numberFY211-02

Modules

Roofs, twin slide, single slide, S slide,  plastic panels,

Stairs, decks, posts, climber,

Product Size

685*710*500 cm

Materials

a. Plastic parts: UV Resistant LLDPE

b. Post: Galvanized steel pipe

c. Metal: Galvanized steel

d. Decks, stairs:steel with plastic covered

e. Fasteners: 304 stainless steel

f. Roof: Aluminum alloy

(Different materials are available at your demand)

Advantage

a. Anti-UV

b. Anti-static

c. Security

d. Environmental protection

e.Color is not easy to fade

Installation

12 hours (3 persons)

Falling Height(cm)

188 cm

Capacity

15-30

Apply to

Amusement parks, kindergartens, nursery centers, parks, residential areas

Delivery time

10 days after received first payment

Warranty3 years for plastic & metal parts
Remark

1.Please check the screws and other catchers regularly to ensure that the structure is firm.

2. Please ensure that all children play under adult supervision.

3. Blunt objects and acidic corrosive liquids are forbidden.


Hot-sale product


Why choose us?

1.Our products sell well in more than 60 countries and regions, and have provided services such as planning and design, preschool education equipment and educational toys for more than 50,000 kindergartens and communities around the world.

2.We have won more than 200 technical patents.


Product case


Our services 

1.Before shipping, we will strictly check each component to ensure there is no  problem.

2.Free detailed installation diagrams to ensure you can solve installation problems after receiving the product.


Product advantages

1.Platform: Platform carrying capacity (in line with the EU EN1176 standard)

2.Plastic parts: Bright colors, anti-ultraviolet (UV) ability to 8, strong anti-static ability, safety and environment protection, weather resistant and high strength.


Material details

1. The plastic material is made of imported engineering plastics from Matrix, which is resistant to ageing and maintain colour and gloss.

2. The surface of the steel pipe parts is treated with corrosion-resistant galvanization.


production base


Production line & Equipment Rotating for Plastic Parts                                                                                                           Production line & Equipment meral parts


Raw material


FAQ 


Q1:what is the payment term and delivery time?

T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container. 

For order more than 50,000.00$, we accept L/C. 

For trial orders, we accept western union, paypal or cash. 

Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.

Q2: How can I place order?

Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.



Customer group photo


Qualification certificate


Customer feedback





Inquiry
*Products:
*Contact Name:
*Email:
*Tel:
*Company:
*Message: