FY203-01
FY203-01
FY203-01
community children playground climbing net factory
Product Description

Brand

FEIYOU

Certificate

ISO14001、ISO18000、ISO9001、TUV

Item number

FY203-01

Modules

Roofs, twin slide, single slide, S slide,  tube ,

plastic panels,

Stairs, decks, posts, climber, bridge,

Product Size

960*643*480 cm

Materials

a. Plastic parts: UV Resistant LLDPE

b. Post: Galvanized steel pipe

c. Metal: Galvanized steel

d. Decks, stairs: steel with plastic covered

e. Fasteners: 304 stainless steel

f. Roof: Aluminum alloy

(Different materials are available at your demand)

Advantage

a. Anti-UV

b. Anti-static

c. Security

d. Environmental protection

e.Color is not easy to fade

Installation

24 hours (5 persons)

Falling Height(cm)188 cm
Capacit

15-30

Apply to

Amusement parks, kindergartens, nursery centers, parks, residential areas

Delivery time

10 days after received first payment

Warranty3 years for plastic & metal parts
Remark

1.Please check the screws and other catchers regularly to ensure that the structure is firm.

2. Please ensure that all children play under adult supervision.

3. Blunt objects and acidic corrosive liquids are forbidden.


Hot-sale product


Why choose us?

1.The products have passed ISO, TUV and other certifications, and the raw materials have passed the SGS test, which is safe and environmentally friendly.

2.We have five production areas with nearly 130,000 square meters of modern standard workshop. Product is cost-effective with reliable quality.


Product case


Our services 

1. Free trial installation service before delivery.

2. Free detailed installation diagrams to ensure you can solve installation problems after receiving the product.


Product advantages

1. Iron parts: (Pipe quality are in line with the requirements of BS1387-1985 standard, technical standards meet BS1387-1985 ) welding using argon arc welding and CO2 gas shielded welding (in line with GB/T8810-1995 requirements )

2. Long warranty period, 2 years for metal parts and 3 years for plastic parts.


Material details

1. The plastic material is made of imported engineering plastics from Matrix, which is resistant to ageing and maintain colour and gloss.

2. The surface of the steel pipe parts is treated with corrosion-resistant galvanization.


production base


Production line & Equipment Rotating for Plastic Parts                                                                                                           Production line & Equipment meral parts


Advanced equipment


FAQ 


Q1:What about the trade term

Trade terms: EXW, FOB, CFR, CIF, DDU, DDP.

Q2:what is the payment term and delivery time?

T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container. 

For order more than 50,000.00$, we accept L/C. 

For trial orders, we accept western union, paypal or cash. 

Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.

Q3: How can I place order?

Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.


Customer group photo


Qualification certificate


Customer feedback

Inquiry
*Products:
*Contact Name:
*Email:
*Tel:
*Company:
*Message: