Brand | FEIYOU |
Certificate | ISO14001、ISO18000、ISO9001、TUV |
Item number | FY217-01 |
Modules | Roofs, twin slide, single slide, S slide, tube , plastic panels, Stairs, decks, posts, |
Product Size | 876*820*540 cm |
Materials | a. Pole, stair: yellow rose wood b. Roof, Panel: yellow rose wood, UV resistance LLDPE c. slide: UV resistance LLDPE d. Fasteners: 304 stainless steel (Different materials are available at your demand) |
Advantage | a. Anti-UV b. Anti-static c. Security d. Environmental protection e.Color is not easy to fade |
Installation | 24 hours (5 persons) |
Falling Height(cm) | 188 cm |
Capacit | 15-30 |
Apply to | Amusement parks, kindergartens, nursery centers, parks, residential areas |
Delivery time | 10 days after received first payment |
Warranty | 3 years for plastic & metal parts |
Remark | 1.Please check the screws and other catchers regularly to ensure that the structure is firm. 2. Please ensure that all children play under adult supervision. 3. Blunt objects and acidic corrosive liquids are forbidden. |
▍Hot-sale product
▍Why choose us?
1.We have won more than 200 technical patents.
2.Our products sell well in more than 60 countries and regions, and have provided services such as planning and design, preschool education equipment and educational toys for more than 50,000 kindergartens and communities around the world.
▍Product case
▍Our services
1. Before placing an order, we have a professional team to follow up on your needs and we provide the best solution for each customer.
2. Before shipping, we will strictly check each component to ensure there is no problem.
▍Product advantages
1. Column: Smooth surface, strong UV resistance, bright colors, not easy to fall off, corrosion resistant.
2. Platform: Platform carrying capacity (in line with the EU EN1176 standard)
▍Material details
1. The platform and stairs are made of corrosion resistant steel plates from Baogang Group.
2. The outdoor wood products are made of high quality timber, such as imported Rosewood.
▍production base
▍Production line & Equipment Rotating for Plastic Parts ▍Production line & Equipment meral parts
▍Packing
▍FAQ
Q1:what is the payment term and delivery time?
T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.
For order more than 50,000.00$, we accept L/C.
For trial orders, we accept western union, paypal or cash.
Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.
Q2: How can I place order?
Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.
▍Customer group photo
▍Qualification certificate
▍Customer feedback