hospital
hospital health street equipment Galvanized Factory direct sales
Product Description

Materials

Center Post: Ø114 Twice Hot-Dip Zinc Steel Tubes, thickness 3.0mm

hand post; Ø32 Twice Hot-Dip Zinc Steel Tubes, thickness 2.5mm

All spare parts are galvanized before welding or assembly.

Screw: 304# Stainless Steel Bolts & Screw.

For all Outdoor Fitness Equipment, we just apply with twice Hot-dip Zinc Steel Tubes, and for every welding part, we will make the anti-rust process(galvanization)

Size

300×91×245cm

Maximum permissible user body weight

150KG

Capacity1
Age Group

Adult

Packing volume0.2 CBM
Gross Weight40 KG
Color

Green, light yellow, black

Install Hour0.5 hours
Warranty

3 years for metal structure

CertificationGS,ISO


Hot-sale product


Why choose us? 

1.Our products sell well in more than 60 countries and regions, and have provided services such as planning and design, preschool education equipment and educational toys for more than 50,000 kindergartens and communities around the world.


Product case


Our services

1.Free trial installation service before delivery.

2.Free detailed installation diagrams to ensure you can solve installation problems after receiving the product.


Product advantages 

1.Nowdays, most of people  are aware of the positive effects physical activity has on our body – like improving our strength, balance, and flexibility. outdoor workout equipment can provide several wider benefits to these, including: social integration and accessibility, 

2.As outdoor fitness parks quickly become natural, intergenerational meeting points for people, they can be a great social benefit to the community. 


Material details 

1.We are adding  the Anti-rust painting on welding position before polish

2.semi-finished parts are baking in oven before powder paiting.


production base


Advanced equipment


FAQ 


Q1: How can I place order?

Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.

Q2: What about the Installation?

We can provide our professional installation team for assembling the playground in your area, you will be in charge for all the costs for the team.

Q3: How long does it take to get a plan or design?

It depends on the size of your playground. It takes 1-2 days to complete an overall design.

 

Qualification certificate


Customer feedback

Inquiry
*Products:
*Contact Name:
*Email:
*Tel:
*Company:
*Message: